Grain System Construction Project

The drive over pit where trucks will unload grain.  Grain will ride a conveyer over to the Leg.  The base of the elevator leg has the round yellow GSI sticker on it.
Newly Certified Operator
Mark & Spenser Sexton from Grain Equipment Sales & Service pouring the footer for the pit.




Moving red dirt for the bin pad


Jackson Excavating doing the dirt work for the project.
CEMC completing 3 Phase Power Installation



Tower for the air delivery system from the dryer.


Preparing the footer and pad for the leg.


Pad for the new dryer complete with 3 generations of hand prints.