The drive over pit where trucks will unload grain. Grain will ride a conveyer over to the Leg. The base of the elevator leg has the round yellow GSI sticker on it.
 |
Newly Certified Operator |
 |
Mark & Spenser Sexton from Grain Equipment Sales & Service pouring the footer for the pit. |
 |
Moving red dirt for the bin pad |
 |
Jackson Excavating doing the dirt work for the project. |
 |
CEMC completing 3 Phase Power Installation |
 |
Tower for the air delivery system from the dryer. |
 |
Preparing the footer and pad for the leg. |
 |
Pad for the new dryer complete with 3 generations of hand prints. |